Changes for page Commissioning and First Start-Up
Last modified by jadomatis on 2026/08/31 10:15
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -8,11 +8,50 @@ 8 8 Important: Remove the protective cap from the laser objective before starting the laser.** 9 9 ))) 10 10 11 -= Preconditions = 11 += Preconditions(Before Switching On) = 12 12 13 13 Confirm the following before applying power: 14 14 15 -* All packaging material has been removed 16 -* All transport locks have been removed 17 -* The High-Light is standing upright in its intended operation position 18 -* Supply voltage and frequen 15 +* All packaging material has been removed. 16 +* All transport locks have been removed. 17 +* The High-Light is standing upright in its intended operation position. 18 +* Supply voltage and frequency have been checked against the machine requirements. 19 +* The mains cable and plug are undamaged. 20 +* The main switch is in the OFF position before connecting the power cable. 21 +* The laser protection window is undamaged. 22 +* Optical components are free from dust and contamination. 23 +* The protective cover has been removed from the focusing objective. 24 +* All required laser-safety measures have been implemented and verified. 25 + 26 +The operating environments must also meet the High-Light requirements: 27 + 28 +* Ambient temperature: +15 °C to +35 °C. 29 +* Relative humidity: maximum 90%, non condensing. 30 +* If the system has experienced significant temperature changes during transport, allow it to return to room temperature before commissioning. 31 +* Avoid shocks, vibration and other mechanical stress. 32 +* Keep the ventilation openings and filter areas of both 19" units unobstructed to prevent heat build-up. 33 + 34 +Suitable extraction must be available for the marking process. Laser processing can generate gases, vapors, aerosols and dust depending on the material and parameters. The operator is responsible for providing appropriate extraction to protect personnel, the environment and the working optics. 35 + 36 += Electrical Start-Up = 37 + 38 +1. Verify that the High-Light has been installed correctly and that the main switch is OFF. 39 +1. Connect the machine to the specified electrical supply. 40 +1. Ensure that the required extraction system is available and ready for operatoon. 41 +1. Open the cabin door. 42 +1. Connect the control PC/laptop to the laser and switch on the laser system. 43 +1. If the blue Acknowledge button is illuminated, press it once. 44 +1. After successful acknowledgement and communication with the controller, the green status LED remains illuminated. 45 + 46 += Software and Device Connection = 47 + 48 +1. Start AnyMarker Designer on the control PC. 49 +1. Establish communication with High-Light controller. 50 +1. Verify that the machine is connected and that no active fault prevents operation. 51 +1. Confirm that the positioning/focus laser is available. During the startup sequence, two red laser points become visible once the system has initialized successfully. 52 + 53 + 54 + 55 += Initial Checks With Pilot Laser = 56 + 57 +Before performing the first marking,