Changes for page Commissioning and First Start-Up
Last modified by jadomatis on 2026/08/31 10:15
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -10,4 +10,12 @@ 10 10 11 11 = Preconditions = 12 12 13 -Confirm the following 13 +Confirm the following before applying power: 14 + 15 +* All packaging material has been removed 16 +* All transport locks have been removed 17 +* The High-Light is standing upright in its intended operation position 18 +* Supply voltage and frequency have been checked against the machine requirements 19 +* The mains cable and plug are undamaged 20 +* The main switch is in the OFF position before connecting the power cable 21 +* The laser procytec