Änderungen von Dokument Commissioning and First Start-Up
Zuletzt geändert von jadomatis am 2026/08/31 10:15
Zusammenfassung
-
Seiteneigenschaften (1 geändert, 0 hinzugefügt, 0 gelöscht)
Details
- Seiteneigenschaften
-
- Inhalt
-
... ... @@ -4,7 +4,31 @@ 4 4 5 5 (% class="box warningmessage" %) 6 6 ((( 7 -**Only qualified personnel may commission the system. Observe all safety notes before switching on.** 7 +**Only qualified personnel may commission the system. Observe all safety notes before switching on. 8 +Important: Remove the protective cap from the laser objective before starting the laser.** 8 8 ))) 9 9 10 - 11 += Preconditions = 12 + 13 +Confirm the following before applying power: 14 + 15 +* All packaging material has been removed. 16 +* All transport locks have been removed. 17 +* The High-Light is standing upright in its intended operation position. 18 +* Supply voltage and frequency have been checked against the machine requirements. 19 +* The mains cable and plug are undamaged. 20 +* The main switch is in the OFF position before connecting the power cable. 21 +* The laser protection window is undamaged. 22 +* Optical components are free from dust and contamination. 23 +* The protective cover has been removed from the focusing objective. 24 +* All required laser-safety measures have been implemented and verified. 25 + 26 +The operating environments must also meet the High-Light requirements: 27 + 28 +* Ambient temperature: +15 °C to +35 °C. 29 +* Relative humidity: maximum 90%, non condensing. 30 +* If the system has experienced significant temperature changes during transport, allow it to return to room temperature before commissioning. 31 +* Avoid shocks, vibration and other mechanical stress. 32 +* Keep the ventilation openings and filter areas of both 19" units unobstructed to prevent heat build-up. 33 + 34 +Suitable extraction must be available for the mar