Zusammenfassung
-
Seiteneigenschaften (1 geändert, 0 hinzugefügt, 0 gelöscht)
Details
- Seiteneigenschaften
-
- Inhalt
-
... ... @@ -8,7 +8,7 @@ 8 8 Important: Remove the protective cap from the laser objective before starting the laser.** 9 9 ))) 10 10 11 -= Preconditions = 11 += Preconditions(Before Switching On) = 12 12 13 13 Confirm the following before applying power: 14 14 ... ... @@ -45,4 +45,13 @@ 45 45 46 46 = Software and Device Connection = 47 47 48 - 48 +1. Start AnyMarker Designer on the control PC. 49 +1. Establish communication with High-Light controller. 50 +1. Verify that the machine is connected and that no active fault prevents operation. 51 +1. Confirm that the positioning/focus laser is available. During the startup sequence, two red laser points become visible once the system has initialized successfully. 52 + 53 + 54 + 55 += Initial Checks With Pilot Laser = 56 + 57 +Before performing the first marking,