Description: Learn how to receive, inspect, unpack, move, and install the Auto-Light before commissioning. Apply the same checks after any relocation.
- Delivery Inspection
- External Transportation
- Unpacking
- In-Plant Transportation
- Installation-Site Requirements
- Placement and Service Clearance
- Mechanical and Electrical Installation
- Installation Completion Check
- Long-Distance Transport
Delivery Inspection
Inspect the shipment immediately after unloading and before installation:
- Check the Auto-Light and all supplied components for visible transport damage.
- Check accessible screws and threaded connections for signs of movement or loosening.
- Compare the shipment with the order and delivery documents; the actual configuration and options may differ from the manual's standard-configuration list.
- If anything is damaged or missing, record it in writing, note it on the freight documents, take photographs, and send the report to Schilling Marking Systems.
External Transportation
- Keep the carton upright and firmly secured to the pallet.
- Secure the palletised shipment against sliding and tipping throughout transport.
- Use a forklift suitable for the weight and delivered configuration when unloading the palletised carton.
- Protect the shipment from strong vibration, shock, contamination, and weather exposure.
Unpacking
Two qualified people are required to remove the transport packaging.
- Place the carton and pallet upright on level ground using a suitable forklift.
- Stabilise the load, then release the black tensioning straps.
- Remove the carton and packing sections carefully so that no section tips or falls.
- Remove the remaining packaging and transport restraints only when the equipment is supported and ready for installation.
- Retain reusable packaging and every delivered transport restraint for future shipment or long-distance relocation.
In-Plant Transportation
- Stop the process and set the rear main switch to 0 (OFF).
- Disconnect the electrical supply cable.
- Disconnect and remove the extraction system where fitted, following the extraction supplier's instructions.
- Keep the equipment upright and slightly lift the supported assembly with handling equipment suitable for its weight and configuration.
- Move it without strong vibration or shock and place it on a level, clean installation surface.
- After relocation, realign the system, repeat the initial electrical commissioning procedure, and perform a controlled functional test.
Installation-Site Requirements
| Requirement | Installation criterion |
| Environment | +15 °C to +35 °C; relative humidity no higher than 90%, non-condensing. |
| Acclimatisation | After a major temperature change, allow the equipment to return to room temperature before commissioning. |
| Support | Upright, level, clean, stable, and suitable for the delivered configuration. |
| Cooling | Provide adequate air to both 19-inch rack units; keep ventilation openings and filter mats unobstructed. |
| Extraction | Provide extraction suitable for the gases, vapours, aerosols, and dust generated by the material and process. |
| Safety | Complete the host enclosure, access control, emergency-stop functions, shutter interlocks, emission warning, and other required safeguards. |
Placement and Service Clearance
Use the delivered drawings for the final mounting design. The following illustration is a planning summary and does not replace the configuration-specific drawings.

Mechanical and Electrical Installation
- Remove all remaining packaging and transport restraints, then place and secure the equipment upright according to the approved machine design and delivered drawings.
- Verify that the connection voltage and frequency match the system data.
- Inspect the mains cable and plug for damage and correct specification. Keep the rear main switch at 0 (OFF) before connecting the mains cable to the Auto-Light or supply socket.
- Complete the approved X1 safety and production-interface wiring. Connect X2 only for the axes included in the validated configuration.
- Route and secure the approved USB, Ethernet, HDMI, axis, safety, power, extraction, and fibre connections so they are protected from damage and do not obstruct cooling or service access.
- Inspect any installed laser-protection glass for damage and confirm that the complete host-machine safeguarding is ready for formal validation.
Installation Completion Check
Before the system is commissioned, confirm all of the following:
- The mechanical installation is complete, aligned, secure, and free from transport restraints.
- The electrical installation is complete and the input voltage is correct.
- The optics are free from dust and contamination; remove the focusing-objective protection cover only when final placement and inspection are complete.
- The environmental conditions, cooling airflow, and extraction comply with the approved design.
- The responsible personnel understand the applicable laser-safety requirements.
- Every required laser-safety measure has been implemented and is ready for verification by an authorised person.
Long-Distance Transport
Repack the Auto-Light as originally delivered, using the original carton, pallet, packing sections, straps, and transport restraints. The source manual specifically mentions a door restraint; install it when the delivered configuration includes an enclosure door. For other configurations, reinstall every original restraint supplied with that system.