Wiki source code of Transportation and Installation
Show last authors
| author | version | line-number | content |
|---|---|---|---|
| 1 | **Description**: Learn how to receive, inspect, unpack, move, and install the Auto-Light before commissioning. Apply the same checks after any relocation. | ||
| 2 | |||
| 3 | (% class="box errormessage" %) | ||
| 4 | ((( | ||
| 5 | **Class 4 integration laser: **Transportation and installation may be performed only by qualified personnel. Do not apply power until the Auto-Light and the host machine have been mechanically and electrically installed and all required laser-safety measures are ready for validation. | ||
| 6 | ))) | ||
| 7 | |||
| 8 | ---- | ||
| 9 | |||
| 10 | = Delivery Inspection = | ||
| 11 | |||
| 12 | Inspect the shipment immediately after unloading and before installation: | ||
| 13 | |||
| 14 | * Check the Auto-Light and all supplied components for visible transport damage. | ||
| 15 | * Check accessible screws and threaded connections for signs of movement or loosening. | ||
| 16 | * Compare the shipment with the order and delivery documents; the actual configuration and options may differ from the manual's standard-configuration list. | ||
| 17 | * If anything is damaged or missing, record it in writing, note it on the freight documents, take photographs, and send the report to Schilling Marking Systems. | ||
| 18 | |||
| 19 | (% class="box warningmessage" %) | ||
| 20 | ((( | ||
| 21 | **Protect the optics: **Keep the lens-unit or objective protection cover installed until the marking head is in its final installed position. Clean, undamaged optics are required for correct marking performance | ||
| 22 | ))) | ||
| 23 | |||
| 24 | |||
| 25 | |||
| 26 | = External Transportation = | ||
| 27 | |||
| 28 | * Keep the carton upright and firmly secured to the pallet. | ||
| 29 | * Secure the palletised shipment against sliding and tipping throughout transport. | ||
| 30 | * Use a forklift suitable for the weight and delivered configuration when unloading the palletised carton. | ||
| 31 | * Protect the shipment from strong vibration, shock, contamination, and weather exposure. | ||
| 32 | |||
| 33 | |||
| 34 | |||
| 35 | = Unpacking = | ||
| 36 | |||
| 37 | Two qualified people are required to remove the transport packaging. | ||
| 38 | |||
| 39 | 1. Place the carton and pallet upright on level ground using a suitable forklift. | ||
| 40 | 1. Stabilise the load, then release the black tensioning straps. | ||
| 41 | 1. Remove the carton and packing sections carefully so that no section tips or falls. | ||
| 42 | 1. Remove the remaining packaging and transport restraints only when the equipment is supported and ready for installation. | ||
| 43 | 1. Retain reusable packaging and every delivered transport restraint for future shipment or long-distance relocation. | ||
| 44 | |||
| 45 | (% class="box warningmessage" %) | ||
| 46 | ((( | ||
| 47 | **Handling rule: **Keep the Auto-Light upright. Avoid mechanical loads, vibration, and impact; the system contains high-quality electrical and optical components. | ||
| 48 | ))) | ||
| 49 | |||
| 50 | |||
| 51 | |||
| 52 | = In-Plant Transportation = | ||
| 53 | |||
| 54 | 1. Stop the process and set the rear main switch to 0 (OFF). | ||
| 55 | 1. Disconnect the electrical supply cable. | ||
| 56 | 1. Disconnect and remove the extraction system where fitted, following the extraction supplier's instructions. | ||
| 57 | 1. Keep the equipment upright and slightly lift the supported assembly with handling equipment suitable for its weight and configuration. | ||
| 58 | 1. Move it without strong vibration or shock and place it on a level, clean installation surface. | ||
| 59 | 1. After relocation, realign the system, repeat the initial electrical commissioning procedure, and perform a controlled functional test. | ||
| 60 | |||
| 61 | |||
| 62 | |||
| 63 | = Installation-Site Requirements = | ||
| 64 | |||
| 65 | (% class="table-condensed table-striped" style="width:1272px" %) | ||
| 66 | |(% style="width:299px" %)**Requirement**|(% style="width:971px" %)**Installation criterion** | ||
| 67 | |(% style="width:299px" %)Environment|(% style="width:971px" %)+15 °C to +35 °C; relative humidity no higher than 90%, non-condensing. | ||
| 68 | |(% style="width:299px" %)Acclimatisation|(% style="width:971px" %)After a major temperature change, allow the equipment to return to room temperature before commissioning. | ||
| 69 | |(% style="width:299px" %)Support|(% style="width:971px" %)Upright, level, clean, stable, and suitable for the delivered configuration. | ||
| 70 | |(% style="width:299px" %)Cooling|(% style="width:971px" %)Provide adequate air to both 19-inch rack units; keep ventilation openings and filter mats unobstructed. | ||
| 71 | |(% style="width:299px" %)Extraction|(% style="width:971px" %)Provide extraction suitable for the gases, vapours, aerosols, and dust generated by the material and process. | ||