... ... @@ -51,14 +51,4 @@
51 51  For software-specific job preparation, use the **[[AnyMarker Designer XWiki>>url:https://docs2.anymarker.de]]**.
52 52  )))
53 53  
54 -
55 -
56 -= Run =
57 -
58 -1. Close and secure the approved host-machine enclosure. Confirm that both emergency-stop circuits and both shutter circuits are satisfied and acknowledged as required by the validated safety sequence.
59 -1. Start the job using the approved AnyMarker Designer or host-machine production sequence.
60 -1. Monitor the integrated machine and the LASER READY, LASER BUSY, LASER END, SHUTTER, and emergency-stop status signals used by the installation.
61 -1. Remain at the operating position while the system is powered or processing. Do not leave the laser system unattended.
62 -1. If the start condition is lost, allow the laser cell to stop and investigate only after the system is in a safe state.
63 -