Änderungen von Dokument Commisioning and First Start
Zuletzt geändert von jadomatis am 2026/09/07 09:02
Zusammenfassung
-
Seiteneigenschaften (3 geändert, 0 hinzugefügt, 0 gelöscht)
Details
- Seiteneigenschaften
-
- Titel
-
... ... @@ -1,1 +1,0 @@ 1 -Commisioning and First Start - Übergeordnete Seite
-
... ... @@ -1,1 +1,0 @@ 1 -Schilling Marking Systems Auto-Light.Getting Started.WebHome - Inhalt
-
... ... @@ -1,101 +1,0 @@ 1 -**Description**: Learn how to Commission the Auto-Light safely after transport, installation, integration, or relocation. Complete every integration-safety check before power is applied, then perform the first electrical start-up and controlled functional test. 2 - 3 -{{toc/}} 4 - 5 -(% class="box errormessage" %) 6 -((( 7 -**Class 4 integration laser: **Only trained and authorized personnel may commission the Auto-Light. Do not switch on the system until the protective enclosure, access safeguards, emergency-stop circuits, shutter circuits, emission warning, extraction, and all site-specific laser-safety measures have been completed, tested, documented, and accepted by an authorized person. 8 -))) 9 - 10 ----- 11 - 12 -= Preconditions (Before Switching On) = 13 - 14 -Confirm all of the following before applying power: 15 - 16 -* Remove all packaging and transport restraints. Position the supplied equipment upright on a stable installation surface and complete the mechanical installation. 17 -* Verify that the mains voltage and frequency match the delivered system data. Keep the rear main switch in the OFF position while making or checking connections. 18 -* Inspect the mains cable and plug. Do not use the system if either is damaged, incorrectly specified, or insecurely connected. 19 -* Confirm that the X1 safety and production interface is wired to the approved external safety circuit, including both emergency-stop channels and both shutter channels. 20 -* Confirm that opening the protective enclosure or guard interrupts the shutter circuit. Test emergency-stop acknowledgement and all required safety-status signals before enabling laser operation. 21 -* If X2-controlled axes are installed, verify the approved axis wiring, direction, step, and zero-signal configuration before commanding movement. 22 -* Inspect any installed laser-protection window or enclosure glazing for damage. The protection must match the installed wavelength and power. 23 -* Ensure the focusing objective and other optical components are clean and free from dust. Leave the objective protection cap in place until immediately before start-up. 24 -* Provide unobstructed airflow at the 19-inch rack ventilation openings and filter mats. Do not operate the system if heat can accumulate. 25 -* Confirm an ambient temperature of +15 °C to +35 °C and relative humidity no higher than 90%, non-condensing. Allow the system to return to room temperature after major temperature changes. 26 -* Start and verify the approved extraction system for the material and process before any test marking. 27 - 28 -(% class="box warningmessage" %) 29 -((( 30 -The Auto-Light may be switched on only after an authorized person has checked the complete integrated installation and confirmed that the laser-safety measures comply with the applicable requirements. 31 -))) 32 - 33 - 34 - 35 - 36 -= Electrical Start-Up = 37 - 38 -**Before starting: **Remove the protection cap from the laser objective. Never energize the laser with the objective cap fitted. 39 - 40 -1. Confirm that the integrated protective enclosure is closed, all safety circuits are ready, and extraction is running. 41 -1. Set the main switch on the rear of the Auto-Light rack to I (ON). 42 -1. Turn the laser key switch on the front of the rack to I. 43 -1. Observe the system status. If the system does not reach the expected ready state, switch it off and correct the cause before continuing. 44 - 45 -[[image:1788521448348-845.png]] 46 - 47 - 48 - 49 - 50 -[[image:1788521448357-184.png]] 51 - 52 - 53 -= Software and Device Connection = 54 - 55 -1. ((( 56 -Start the approved workstation and open AnyMarker Designer. 57 -))) 58 -1. Verify communication with the Auto-Light controller and confirm that the expected device configuration and approved parameters are available. 59 -1. If communication is not established, stop the procedure, switch the Auto-Light off, and check the approved USB or Ethernet connection before restarting. 60 - 61 -For software-specific steps, use the **[[AnyMarker Designer XWiki>>url:https://docs2.anymarker.de]]**. This article does not replace the current software instructions. 62 - 63 - 64 -= Initial Checks With the Pilot Laser = 65 - 66 -* Load or create an approved test layout in AnyMarker Designer. 67 -* Use the Pilot function to display the marking field without production-laser emission. 68 -* Verify the orientation and position of the projected field on the test workpiece while the protective enclosure remains closed. 69 -* Stop if the pilot outline, axis movement, or workpiece position does not match the validated setup. 70 - 71 - 72 - 73 -= Focus and Workpiece Positioning = 74 - 75 -1. Secure the test workpiece or fixture in the approved marking position. 76 -1. Adjust the electrically controlled Z-axis until the specified focus distance is reached. The correct focus distance is required for a permanent, legible mark. 77 -1. Use the pilot outline and the approved focus method to confirm the marking location and focus before permitting production-laser emission. 78 - 79 - 80 - 81 -= First Functional Test = 82 - 83 -1. Select a verified parameter set for the test material and confirm that extraction is operating. 84 -1. With the protective enclosure closed and all safeguards active, perform a short test mark on an approved sample. 85 -1. Monitor the ready, busy, end, shutter, and emergency-stop status signals used by the integrated machine. 86 -1. Inspect the result for position, focus, legibility, contrast, and unwanted thermal effects. Correct the setup only after laser emission has stopped. 87 -1. Record the accepted hardware configuration, software/device connection, safety-test result, and approved marking parameters before handing the system over for operation. 88 - 89 -(% class="box warningmessage" %) 90 -((( 91 -**Stop immediately: **If a safeguard, shutter circuit, emergency-stop function, status signal, axis, extraction system, or optical component behaves unexpectedly, stop commissioning and isolate the equipment. Do not bypass the fault to complete the test. 92 -))) 93 - 94 - 95 - 96 - 97 -= Controlled Shutdown After the Test = 98 - 99 -1. End the marking command and confirm that laser emission has stopped. 100 -1. Set the rear main switch to 0 (OFF). 101 -1. Front key switch can remain at I or be returned to 0. Follow the site's approved key-control and access procedure.