Details

Page properties
Content
... ... @@ -1,10 +1,14 @@
1 1  **Description**: Learn how to Commission the Auto-Light safely after transport, installation, integration, or relocation. Complete every integration-safety check before power is applied, then perform the first electrical start-up and controlled functional test.
2 2  
3 -(% class="box warningmessage" %)
3 +{{toc/}}
4 +
5 +(% class="box errormessage" %)
4 4  (((
5 5  **Class 4 integration laser: **Only trained and authorized personnel may commission the Auto-Light. Do not switch on the system until the protective enclosure, access safeguards, emergency-stop circuits, shutter circuits, emission warning, extraction, and all site-specific laser-safety measures have been completed, tested, documented, and accepted by an authorized person.
6 6  )))
7 7  
10 +----
11 +
8 8  = Preconditions (Before Switching On) =
9 9  
10 10  Confirm all of the following before applying power:
... ... @@ -28,6 +28,7 @@
28 28  
29 29  
30 30  
35 +
31 31  = Electrical Start-Up =
32 32  
33 33  **Before starting: **Remove the protection cap from the laser objective. Never energize the laser with the objective cap fitted.
... ... @@ -88,6 +88,7 @@
88 88  
89 89  
90 90  
96 +
91 91  = Controlled Shutdown After the Test =
92 92  