Changes for page Commisioning and First Start
Last modified by jadomatis on 2026/09/07 09:02
Summary
-
Page properties (3 modified, 0 added, 0 removed)
Details
- Page properties
-
- Title
-
... ... @@ -1,1 +1,0 @@ 1 -Commisioning and First Start - Parent
-
... ... @@ -1,1 +1,0 @@ 1 -Schilling Marking Systems Auto-Light.Getting Started.WebHome - Content
-
... ... @@ -1,95 +1,0 @@ 1 -**Description**: Learn how to Commission the Auto-Light safely after transport, installation, integration, or relocation. Complete every integration-safety check before power is applied, then perform the first electrical start-up and controlled functional test. 2 - 3 -(% class="box warningmessage" %) 4 -((( 5 -**Class 4 integration laser: **Only trained and authorized personnel may commission the Auto-Light. Do not switch on the system until the protective enclosure, access safeguards, emergency-stop circuits, shutter circuits, emission warning, extraction, and all site-specific laser-safety measures have been completed, tested, documented, and accepted by an authorized person. 6 -))) 7 - 8 -= Preconditions (Before Switching On) = 9 - 10 -Confirm all of the following before applying power: 11 - 12 -* Remove all packaging and transport restraints. Position the supplied equipment upright on a stable installation surface and complete the mechanical installation. 13 -* Verify that the mains voltage and frequency match the delivered system data. Keep the rear main switch in the OFF position while making or checking connections. 14 -* Inspect the mains cable and plug. Do not use the system if either is damaged, incorrectly specified, or insecurely connected. 15 -* Confirm that the X1 safety and production interface is wired to the approved external safety circuit, including both emergency-stop channels and both shutter channels. 16 -* Confirm that opening the protective enclosure or guard interrupts the shutter circuit. Test emergency-stop acknowledgement and all required safety-status signals before enabling laser operation. 17 -* If X2-controlled axes are installed, verify the approved axis wiring, direction, step, and zero-signal configuration before commanding movement. 18 -* Inspect any installed laser-protection window or enclosure glazing for damage. The protection must match the installed wavelength and power. 19 -* Ensure the focusing objective and other optical components are clean and free from dust. Leave the objective protection cap in place until immediately before start-up. 20 -* Provide unobstructed airflow at the 19-inch rack ventilation openings and filter mats. Do not operate the system if heat can accumulate. 21 -* Confirm an ambient temperature of +15 °C to +35 °C and relative humidity no higher than 90%, non-condensing. Allow the system to return to room temperature after major temperature changes. 22 -* Start and verify the approved extraction system for the material and process before any test marking. 23 - 24 -(% class="box warningmessage" %) 25 -((( 26 -The Auto-Light may be switched on only after an authorized person has checked the complete integrated installation and confirmed that the laser-safety measures comply with the applicable requirements. 27 -))) 28 - 29 - 30 - 31 -= Electrical Start-Up = 32 - 33 -**Before starting: **Remove the protection cap from the laser objective. Never energize the laser with the objective cap fitted. 34 - 35 -1. Confirm that the integrated protective enclosure is closed, all safety circuits are ready, and extraction is running. 36 -1. Set the main switch on the rear of the Auto-Light rack to I (ON). 37 -1. Turn the laser key switch on the front of the rack to I. 38 -1. Observe the system status. If the system does not reach the expected ready state, switch it off and correct the cause before continuing. 39 - 40 -[[image:1788521448348-845.png]] 41 - 42 - 43 - 44 - 45 -[[image:1788521448357-184.png]] 46 - 47 - 48 -= Software and Device Connection = 49 - 50 -1. ((( 51 -Start the approved workstation and open AnyMarker Designer. 52 -))) 53 -1. Verify communication with the Auto-Light controller and confirm that the expected device configuration and approved parameters are available. 54 -1. If communication is not established, stop the procedure, switch the Auto-Light off, and check the approved USB or Ethernet connection before restarting. 55 - 56 -For software-specific steps, use the **[[AnyMarker Designer XWiki>>url:https://docs2.anymarker.de]]**. This article does not replace the current software instructions. 57 - 58 - 59 -= Initial Checks With the Pilot Laser = 60 - 61 -* Load or create an approved test layout in AnyMarker Designer. 62 -* Use the Pilot function to display the marking field without production-laser emission. 63 -* Verify the orientation and position of the projected field on the test workpiece while the protective enclosure remains closed. 64 -* Stop if the pilot outline, axis movement, or workpiece position does not match the validated setup. 65 - 66 - 67 - 68 -= Focus and Workpiece Positioning = 69 - 70 -1. Secure the test workpiece or fixture in the approved marking position. 71 -1. Adjust the electrically controlled Z-axis until the specified focus distance is reached. The correct focus distance is required for a permanent, legible mark. 72 -1. Use the pilot outline and the approved focus method to confirm the marking location and focus before permitting production-laser emission. 73 - 74 - 75 - 76 -= First Functional Test = 77 - 78 -1. Select a verified parameter set for the test material and confirm that extraction is operating. 79 -1. With the protective enclosure closed and all safeguards active, perform a short test mark on an approved sample. 80 -1. Monitor the ready, busy, end, shutter, and emergency-stop status signals used by the integrated machine. 81 -1. Inspect the result for position, focus, legibility, contrast, and unwanted thermal effects. Correct the setup only after laser emission has stopped. 82 -1. Record the accepted hardware configuration, software/device connection, safety-test result, and approved marking parameters before handing the system over for operation. 83 - 84 -(% class="box warningmessage" %) 85 -((( 86 -**Stop immediately: **If a safeguard, shutter circuit, emergency-stop function, status signal, axis, extraction system, or optical component behaves unexpectedly, stop commissioning and isolate the equipment. Do not bypass the fault to complete the test. 87 -))) 88 - 89 - 90 - 91 -= Controlled Shutdown After the Test = 92 - 93 -1. End the marking command and confirm that laser emission has stopped. 94 -1. Set the rear main switch to 0 (OFF). 95 -1. Front key switch can remain at I or be returned to 0. Follow the site's approved key-control and access procedure.