Änderungen von Dokument Commisioning and First Start

Zuletzt geändert von jadomatis am 2026/09/07 09:02

Von Version 2.4
bearbeitet von jadomatis
am 2026/09/04 13:41
Änderungskommentar: Es gibt keinen Kommentar für diese Version
Auf Version 1.1
bearbeitet von jadomatis
am 2026/09/04 13:38
Änderungskommentar: Uploaded new attachment "1788521448348-845.png", version {1}

Zusammenfassung

Details

Seiteneigenschaften
Titel
... ... @@ -1,1 +1,0 @@
1 -Commisioning and First Start
Übergeordnete Seite
... ... @@ -1,1 +1,0 @@
1 -Schilling Marking Systems Auto-Light.Getting Started.WebHome
Inhalt
... ... @@ -1,95 +1,0 @@
1 -**Description**: Learn how to Commission the Auto-Light safely after transport, installation, integration, or relocation. Complete every integration-safety check before power is applied, then perform the first electrical start-up and controlled functional test.
2 -
3 -(% class="box warningmessage" %)
4 -(((
5 -**Class 4 integration laser: **Only trained and authorized personnel may commission the Auto-Light. Do not switch on the system until the protective enclosure, access safeguards, emergency-stop circuits, shutter circuits, emission warning, extraction, and all site-specific laser-safety measures have been completed, tested, documented, and accepted by an authorized person.
6 -)))
7 -
8 -= Preconditions (Before Switching On) =
9 -
10 -Confirm all of the following before applying power:
11 -
12 -* Remove all packaging and transport restraints. Position the supplied equipment upright on a stable installation surface and complete the mechanical installation.
13 -* Verify that the mains voltage and frequency match the delivered system data. Keep the rear main switch in the OFF position while making or checking connections.
14 -* Inspect the mains cable and plug. Do not use the system if either is damaged, incorrectly specified, or insecurely connected.
15 -* Confirm that the X1 safety and production interface is wired to the approved external safety circuit, including both emergency-stop channels and both shutter channels.
16 -* Confirm that opening the protective enclosure or guard interrupts the shutter circuit. Test emergency-stop acknowledgement and all required safety-status signals before enabling laser operation.
17 -* If X2-controlled axes are installed, verify the approved axis wiring, direction, step, and zero-signal configuration before commanding movement.
18 -* Inspect any installed laser-protection window or enclosure glazing for damage. The protection must match the installed wavelength and power.
19 -* Ensure the focusing objective and other optical components are clean and free from dust. Leave the objective protection cap in place until immediately before start-up.
20 -* Provide unobstructed airflow at the 19-inch rack ventilation openings and filter mats. Do not operate the system if heat can accumulate.
21 -* Confirm an ambient temperature of +15 °C to +35 °C and relative humidity no higher than 90%, non-condensing. Allow the system to return to room temperature after major temperature changes.
22 -* Start and verify the approved extraction system for the material and process before any test marking.
23 -
24 -(% class="box warningmessage" %)
25 -(((
26 -The Auto-Light may be switched on only after an authorized person has checked the complete integrated installation and confirmed that the laser-safety measures comply with the applicable requirements.
27 -)))
28 -
29 -
30 -
31 -= Electrical Start-Up =
32 -
33 -**Before starting: **Remove the protection cap from the laser objective. Never energize the laser with the objective cap fitted.
34 -
35 -1. Confirm that the integrated protective enclosure is closed, all safety circuits are ready, and extraction is running.
36 -1. Set the main switch on the rear of the Auto-Light rack to I (ON).
37 -1. Turn the laser key switch on the front of the rack to I.
38 -1. Observe the system status. If the system does not reach the expected ready state, switch it off and correct the cause before continuing.
39 -
40 -[[image:1788521448348-845.png]]
41 -
42 -
43 -
44 -
45 -[[image:1788521448357-184.png]]
46 -
47 -
48 -= Software and Device Connection =
49 -
50 -1. (((
51 -Start the approved workstation and open AnyMarker Designer.
52 -)))
53 -1. Verify communication with the Auto-Light controller and confirm that the expected device configuration and approved parameters are available.
54 -1. If communication is not established, stop the procedure, switch the Auto-Light off, and check the approved USB or Ethernet connection before restarting.
55 -
56 -For software-specific steps, use the **[[AnyMarker Designer XWiki>>url:https://docs2.anymarker.de]]**. This article does not replace the current software instructions.
57 -
58 -
59 -= Initial Checks With the Pilot Laser =
60 -
61 -* Load or create an approved test layout in AnyMarker Designer.
62 -* Use the Pilot function to display the marking field without production-laser emission.
63 -* Verify the orientation and position of the projected field on the test workpiece while the protective enclosure remains closed.
64 -* Stop if the pilot outline, axis movement, or workpiece position does not match the validated setup.
65 -
66 -
67 -
68 -= Focus and Workpiece Positioning =
69 -
70 -1. Secure the test workpiece or fixture in the approved marking position.
71 -1. Adjust the electrically controlled Z-axis until the specified focus distance is reached. The correct focus distance is required for a permanent, legible mark.
72 -1. Use the pilot outline and the approved focus method to confirm the marking location and focus before permitting production-laser emission.
73 -
74 -
75 -
76 -= First Functional Test =
77 -
78 -1. Select a verified parameter set for the test material and confirm that extraction is operating.
79 -1. With the protective enclosure closed and all safeguards active, perform a short test mark on an approved sample.
80 -1. Monitor the ready, busy, end, shutter, and emergency-stop status signals used by the integrated machine.
81 -1. Inspect the result for position, focus, legibility, contrast, and unwanted thermal effects. Correct the setup only after laser emission has stopped.
82 -1. Record the accepted hardware configuration, software/device connection, safety-test result, and approved marking parameters before handing the system over for operation.
83 -
84 -(% class="box warningmessage" %)
85 -(((
86 -**Stop immediately: **If a safeguard, shutter circuit, emergency-stop function, status signal, axis, extraction system, or optical component behaves unexpectedly, stop commissioning and isolate the equipment. Do not bypass the fault to complete the test.
87 -)))
88 -
89 -
90 -
91 -= Controlled Shutdown After the Test =
92 -
93 -1. End the marking command and confirm that laser emission has stopped.
94 -1. he operating manual permits theSet the rear main switch to 0 (OFF).
95 -1. T front key switch to remain at I or be returned to 0. Follow the site's approved key-control and access procedure.