Änderungen von Dokument Commisioning and First Start

Zuletzt geändert von jadomatis am 2026/09/07 09:02

Von Version 2.3
bearbeitet von jadomatis
am 2026/09/04 13:40
Änderungskommentar: Es gibt keinen Kommentar für diese Version
Auf Version 2.2
bearbeitet von jadomatis
am 2026/09/04 13:39
Änderungskommentar: Es gibt keinen Kommentar für diese Version

Zusammenfassung

Details

Seiteneigenschaften
Inhalt
... ... @@ -1,9 +1,8 @@
1 -**Description**: Learn how to Commission the Auto-Light safely after transport, installation, integration, or relocation. Complete every integration-safety check before power is applied, then perform the first electrical start-up and controlled functional test.
1 +**Commissioning and First Start-Up**
2 2  
3 -(% class="box warningmessage" %)
4 -(((
3 +Commission the Auto-Light safely after transport, installation, integration, or relocation. Complete every integration-safety check before power is applied, then perform the first electrical start-up and controlled functional test.
4 +
5 5  **Class 4 integration laser: **Only trained and authorized personnel may commission the Auto-Light. Do not switch on the system until the protective enclosure, access safeguards, emergency-stop circuits, shutter circuits, emission warning, extraction, and all site-specific laser-safety measures have been completed, tested, documented, and accepted by an authorized person.
6 -)))
7 7  
8 8  = Preconditions (Before Switching On) =
9 9  
... ... @@ -21,13 +21,9 @@
21 21  * Confirm an ambient temperature of +15 °C to +35 °C and relative humidity no higher than 90%, non-condensing. Allow the system to return to room temperature after major temperature changes.
22 22  * Start and verify the approved extraction system for the material and process before any test marking.
23 23  
24 -(% class="box warningmessage" %)
25 -(((
26 -The Auto-Light may be switched on only after an authorized person has checked the complete integrated installation and confirmed that the laser-safety measures comply with the applicable requirements.
27 -)))
23 +**T**he Auto-Light may be switched on only after an authorized person has checked the complete integrated installation and confirmed that the laser-safety measures comply with the applicable requirements.
28 28  
29 29  
30 -
31 31  = Electrical Start-Up =
32 32  
33 33  **Before starting: **Remove the protection cap from the laser objective. Never energize the laser with the objective cap fitted.
... ... @@ -45,8 +45,9 @@
45 45  [[image:1788521448357-184.png]]
46 46  
47 47  
48 -\\Software and Device Connection
49 49  
44 += Software and Device Connection =
45 +
50 50  1. Start the approved workstation and open AnyMarker Designer.
51 51  1. Verify communication with the Auto-Light controller and confirm that the expected device configuration and approved parameters are available.
52 52  1. If communication is not established, stop the procedure, switch the Auto-Light off, and check the approved USB or Ethernet connection before restarting.