Änderungen von Dokument Commisioning and First Start

Zuletzt geändert von jadomatis am 2026/09/07 09:02

Von Version 1.1
bearbeitet von jadomatis
am 2026/09/04 13:38
Änderungskommentar: Uploaded new attachment "1788521448348-845.png", version {1}
Auf Version 2.2
bearbeitet von jadomatis
am 2026/09/04 13:39
Änderungskommentar: Es gibt keinen Kommentar für diese Version

Zusammenfassung

Details

Seiteneigenschaften
Titel
... ... @@ -1,0 +1,1 @@
1 +Commisioning and First Start
Übergeordnete Seite
... ... @@ -1,0 +1,1 @@
1 +Schilling Marking Systems Auto-Light.Getting Started.WebHome
Inhalt
... ... @@ -1,0 +1,82 @@
1 +**Commissioning and First Start-Up**
2 +
3 +Commission the Auto-Light safely after transport, installation, integration, or relocation. Complete every integration-safety check before power is applied, then perform the first electrical start-up and controlled functional test.
4 +
5 +**Class 4 integration laser: **Only trained and authorized personnel may commission the Auto-Light. Do not switch on the system until the protective enclosure, access safeguards, emergency-stop circuits, shutter circuits, emission warning, extraction, and all site-specific laser-safety measures have been completed, tested, documented, and accepted by an authorized person.
6 +
7 += Preconditions (Before Switching On) =
8 +
9 +Confirm all of the following before applying power:
10 +
11 +* Remove all packaging and transport restraints. Position the supplied equipment upright on a stable installation surface and complete the mechanical installation.
12 +* Verify that the mains voltage and frequency match the delivered system data. Keep the rear main switch in the OFF position while making or checking connections.
13 +* Inspect the mains cable and plug. Do not use the system if either is damaged, incorrectly specified, or insecurely connected.
14 +* Confirm that the X1 safety and production interface is wired to the approved external safety circuit, including both emergency-stop channels and both shutter channels.
15 +* Confirm that opening the protective enclosure or guard interrupts the shutter circuit. Test emergency-stop acknowledgement and all required safety-status signals before enabling laser operation.
16 +* If X2-controlled axes are installed, verify the approved axis wiring, direction, step, and zero-signal configuration before commanding movement.
17 +* Inspect any installed laser-protection window or enclosure glazing for damage. The protection must match the installed wavelength and power.
18 +* Ensure the focusing objective and other optical components are clean and free from dust. Leave the objective protection cap in place until immediately before start-up.
19 +* Provide unobstructed airflow at the 19-inch rack ventilation openings and filter mats. Do not operate the system if heat can accumulate.
20 +* Confirm an ambient temperature of +15 °C to +35 °C and relative humidity no higher than 90%, non-condensing. Allow the system to return to room temperature after major temperature changes.
21 +* Start and verify the approved extraction system for the material and process before any test marking.
22 +
23 +**T**he Auto-Light may be switched on only after an authorized person has checked the complete integrated installation and confirmed that the laser-safety measures comply with the applicable requirements.
24 +
25 +
26 += Electrical Start-Up =
27 +
28 +**Before starting: **Remove the protection cap from the laser objective. Never energize the laser with the objective cap fitted.
29 +
30 +1. Confirm that the integrated protective enclosure is closed, all safety circuits are ready, and extraction is running.
31 +1. Set the main switch on the rear of the Auto-Light rack to I (ON).
32 +1. Turn the laser key switch on the front of the rack to I.
33 +1. Observe the system status. If the system does not reach the expected ready state, switch it off and correct the cause before continuing.
34 +
35 +[[image:1788521448348-845.png]]
36 +
37 +
38 +
39 +
40 +[[image:1788521448357-184.png]]
41 +
42 +
43 +
44 += Software and Device Connection =
45 +
46 +1. Start the approved workstation and open AnyMarker Designer.
47 +1. Verify communication with the Auto-Light controller and confirm that the expected device configuration and approved parameters are available.
48 +1. If communication is not established, stop the procedure, switch the Auto-Light off, and check the approved USB or Ethernet connection before restarting.
49 +
50 +For software-specific steps, use the **[[AnyMarker Designer XWiki>>url:https://docs2.anymarker.de]]**. This article does not replace the current software instructions.
51 +
52 += Initial Checks With the Pilot Laser =
53 +
54 +* Load or create an approved test layout in AnyMarker Designer.
55 +* Use the Pilot function to display the marking field without production-laser emission.
56 +* Verify the orientation and position of the projected field on the test workpiece while the protective enclosure remains closed.
57 +* Stop if the pilot outline, axis movement, or workpiece position does not match the validated setup.
58 +
59 += Focus and Workpiece Positioning =
60 +
61 +1. Secure the test workpiece or fixture in the approved marking position.
62 +1. Adjust the electrically controlled Z-axis until the specified focus distance is reached. The correct focus distance is required for a permanent, legible mark.
63 +1. Use the pilot outline and the approved focus method to confirm the marking location and focus before permitting production-laser emission.
64 +
65 += First Functional Test =
66 +
67 +1. Select a verified parameter set for the test material and confirm that extraction is operating.
68 +1. With the protective enclosure closed and all safeguards active, perform a short test mark on an approved sample.
69 +1. Monitor the ready, busy, end, shutter, and emergency-stop status signals used by the integrated machine.
70 +1. Inspect the result for position, focus, legibility, contrast, and unwanted thermal effects. Correct the setup only after laser emission has stopped.
71 +1. Record the accepted hardware configuration, software/device connection, safety-test result, and approved marking parameters before handing the system over for operation.
72 +
73 +(% class="box warningmessage" %)
74 +(((
75 +**Stop immediately: **If a safeguard, shutter circuit, emergency-stop function, status signal, axis, extraction system, or optical component behaves unexpectedly, stop commissioning and isolate the equipment. Do not bypass the fault to complete the test.
76 +)))
77 +
78 += Controlled Shutdown After the Test =
79 +
80 +1. End the marking command and confirm that laser emission has stopped.
81 +1. Set the rear main switch to 0 (OFF).
82 +1. The operating manual permits the front key switch to remain at I or be returned to 0. Follow the site's approved key-control and access procedure.