Changes for page Auto-Light Interfaces and Connection Examples
Last modified by jadomatis on 2026/09/08 08:58
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -1,7 +1,5 @@ 1 1 **Description**: Learn how to identify the Auto-Light X0 mains connection, X1 safety and production interface, and X2 axis interface. The pin assignments and diagrams are reproduced from the supplied operating manual in English. 2 2 3 -{{toc/}} 4 - 5 5 (% class="box errormessage" %) 6 6 ((( 7 7 **Qualified integration work only: **The manual diagrams are connection examples, not a complete safety design or permission to wire an energised system. An appropriately qualified integrator must design, calculate, isolate, wire, validate, and document the complete safety-related control system for the delivered machine. ... ... @@ -9,6 +9,7 @@ 9 9 10 10 ---- 11 11 10 + 12 12 = Connection Locations = 13 13 14 14 X0 mains power, X1 safety and production I/O, and X2 axis control are located at the rear of the laser rack. USB, Ethernet, and HDMI connections support the delivered workstation, network, and display arrangement. ... ... @@ -135,36 +135,4 @@ 135 135 |(% style="width:108px" %)24|(% style="width:174px" %)-|(% style="width:207px" %)Not connected 136 136 |(% style="width:108px" %)25|(% style="width:174px" %)-|(% style="width:207px" %)Not connected 137 137 138 - 139 - 140 -= X2 Functional Grouping = 141 - 142 -(% class="table-condensed table-striped" style="width:1125px" %) 143 -|**Axis / function**|(% style="width:391px" %)**Pin(s)**|(% style="width:481px" %)**Direction stated in manual** 144 -|X axis|(% style="width:391px" %)1 Direction; 2 Step; 9 Zero|(% style="width:481px" %)Outputs on all three pins, as stated 145 -|Y axis|(% style="width:391px" %)3 Direction; 4 Step; 11 Zero|(% style="width:481px" %)Direction/Step outputs; Zero input 146 -|Z axis|(% style="width:391px" %)5 Direction; 6 Step; 13 Zero|(% style="width:481px" %)Direction/Step outputs; Zero input 147 -|R axis|(% style="width:391px" %)7 Direction; 8 Step; 15 Zero|(% style="width:481px" %)Direction/Step outputs; Zero input 148 -|Reference|(% style="width:391px" %)17 GND; 19 +5 V|(% style="width:481px" %)Outputs, as stated 149 -|Not connected|(% style="width:391px" %)10, 12, 14, 16, 18, 20-25|(% style="width:481px" %)NC 150 - 151 - 152 - 153 -= Integration and Commissioning Checks = 154 - 155 -* ((( 156 -Confirm X1 is a 25-pin Sub-D socket and X2 is a 25-pin Sub-D plug before preparing mating connectors. 157 -))) 158 -* Keep safety functions, production commands, status monitoring, axis signals, and workstation connections identified separately in the electrical documentation. 159 -* Verify conductor identification, shielding, routing, protective bonding, connector retention, strain relief, and separation from interference sources for the delivered installation. 160 -* Validate both emergency-stop channels, both shutter channels, acknowledgement behavior, guard opening, status outputs, and prevention of unexpected restart before laser operation is released. 161 -* Confirm the External START/STOP logic and LASER READY/BUSY/END sequence against the host control specification without bypassing any safety permission. 162 -* For every installed axis, verify direction, step scaling, travel limits, zero/reference behavior, and safe motion before placing a workpiece in the marking area. 163 -* Document measured results and obtain the required approval for the complete integrated machine, not only the Auto-Light rack. 164 - 165 -(% class="box infomessage" %) 166 -((( 167 - **Troubleshooting boundary: **Operators may record external status and host messages. Pin-level measurement, connector removal, rewiring, safety-module work, and axis electrical testing require isolation and personnel authorized for the delivered integration. Use the Auto-Light Troubleshooting article for symptom-based diagnosis. 168 -))) 169 - 170 170