Changes for page Auto-Light Interfaces and Connection Examples
Last modified by jadomatis on 2026/09/08 08:58
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -134,4 +134,36 @@ 134 134 |(% style="width:108px" %)24|(% style="width:174px" %)-|(% style="width:207px" %)Not connected 135 135 |(% style="width:108px" %)25|(% style="width:174px" %)-|(% style="width:207px" %)Not connected 136 136 137 + 138 + 139 += X2 Functional Grouping = 140 + 141 +(% class="table-condensed table-striped" style="width:1125px" %) 142 +|**Axis / function**|(% style="width:391px" %)**Pin(s)**|(% style="width:481px" %)**Direction stated in manual** 143 +|X axis|(% style="width:391px" %)1 Direction; 2 Step; 9 Zero|(% style="width:481px" %)Outputs on all three pins, as stated 144 +|Y axis|(% style="width:391px" %)3 Direction; 4 Step; 11 Zero|(% style="width:481px" %)Direction/Step outputs; Zero input 145 +|Z axis|(% style="width:391px" %)5 Direction; 6 Step; 13 Zero|(% style="width:481px" %)Direction/Step outputs; Zero input 146 +|R axis|(% style="width:391px" %)7 Direction; 8 Step; 15 Zero|(% style="width:481px" %)Direction/Step outputs; Zero input 147 +|Reference|(% style="width:391px" %)17 GND; 19 +5 V|(% style="width:481px" %)Outputs, as stated 148 +|Not connected|(% style="width:391px" %)10, 12, 14, 16, 18, 20-25|(% style="width:481px" %)NC 149 + 150 + 151 + 152 += Integration and Commissioning Checks = 153 + 154 +* ((( 155 +Confirm X1 is a 25-pin Sub-D socket and X2 is a 25-pin Sub-D plug before preparing mating connectors. 156 +))) 157 +* Keep safety functions, production commands, status monitoring, axis signals, and workstation connections identified separately in the electrical documentation. 158 +* Verify conductor identification, shielding, routing, protective bonding, connector retention, strain relief, and separation from interference sources for the delivered installation. 159 +* Validate both emergency-stop channels, both shutter channels, acknowledgement behavior, guard opening, status outputs, and prevention of unexpected restart before laser operation is released. 160 +* Confirm the External START/STOP logic and LASER READY/BUSY/END sequence against the host control specification without bypassing any safety permission. 161 +* For every installed axis, verify direction, step scaling, travel limits, zero/reference behavior, and safe motion before placing a workpiece in the marking area. 162 +* Document measured results and obtain the required approval for the complete integrated machine, not only the Auto-Light rack. 163 + 164 +(% class="box infomessage" %) 165 +((( 166 + **Troubleshooting boundary: **Operators may record external status and host messages. Pin-level measurement, connector removal, rewiring, safety-module work, and axis electrical testing require isolation and personnel authorized for the delivered integration. Use the Auto-Light Troubleshooting article for symptom-based diagnosis. 167 +))) 168 + 137 137