Transportation and Installation

Version 2.7 by jadomatis on 2025/09/29 10:53

This guide summarizes how to receive, move, unpack, and prepare the Multi-Light for commissioning, using the terminology and sequence from the original manual.

After Delivery: Unloading and Inspection

After unloading, inspect the machine and all parts for transport damage, check screws/fittings, verify delivery completeness, and remove the transport packaging. If there's damage or missing items, record details in writing immediately, note it on the freight papers, photograph the damage, and send a report to Schilling Marking Systems GmbH.

Cautions: Do not remove the lens unit cover until installation is complete. The optics are high-grade components; a flawless state is essential for optimal marking results.

Transport

Shipping:

  • The Multi-light must be transported in a carton on a pallet. Secure the palletized carton against slipping and tipping. Use a suitable forklift for the machine's weight to unload.

In-plant transport:

  • Transport upright only; avoid strong vibrations/shock.
  • Switch the system off at the main switch; disconnect power and remove the exhaust unit.
  • Slightly lift with a suitable forklift, reposition, and place on an even, clean floor.
  • After transport, re-align the system and perform initial electrical start-up and a function test.
  • For long-distance shipping, repack exactly as delivered, including the door transport lock.

Unpacking

Unpacking must be performed by qualified personnel:

  1. Place the palletized carton upright on level ground (use a suitable forklift).
  2. Release the black tension straps.
  3. Remove the carton and all packaging material (two persons required).

Installation (Mechanical and Electrical)

Before installation, ensure all packaging and transport locks are removed and the system is placed upright. After that:

  • Verify mains voltage and frequency.
  • Inspect the power cord and plug for damage; replace is necessary.
  • Ensure the main switch on the operator panel is in position "OFF" before plugging in.
  • Check the laser protection window for damage.

Environmental Requirements

  • Ambient temperature +15C to +35C; relative humidity <90% (non-condensing).
  • If the system experienced major temperature fluctuations, allow it to reach room temperature before use.
  • The laser system contains high-value electrical and optical components - avoid mechanical loads, shocks, and vibrations.
  • Ensure sufficient airflow at both 19" drawer; blocked vents or filter mats can cause heat build-up and damage
    Note for extraction:  Provide suitable fume and dust extraction to prevent hazards to personnel and the environment and to protect the working optics from deposits. Refer to workplace air quality guidance (e.g., VDI 2262). Schilling extraction units are recommended.

Pre-Start Checklist

To ensure a correct installation, verify:

  • Electrical installation complete and input voltage correct.
  • Optical components free of dust and contamination.
  • Lens/focus objective cover has been removed.
  • Ambient conditions meet the technical specifications.
  • You are familiar with laser safety requirements and all safety measures have been implemented.
  • The system may only be switched on after an authorized person confirms compliance with laser safety provisions.