jadomatis 1.2 1 This article summarizes the normal operating sequence for the Multi-Light workstation: switching on, running a marking job, and switching off. Only trained personnel may operate the system. Observe all safety notes before use.
2
3
jadomatis 1.3 4 = Before You Start =
5
6 * Ambient conditions within specifications; system acclimatized if there were temperature changes.
jadomatis 1.4 7 * Machine upright; transport locks removed; airflow at the 19" drawers unobstructed; filter mats clean.
8 * Laser protection window intact; protective housing and door interlocks OK.
9 * Fume/dust extraction ready.
10
11
12
jadomatis 1.5 13 = Switch On =
14
jadomatis 1.6 15 1. Verify mains voltage/frequency and cable conditions; mains switch is OFF.
jadomatis 1.8 16 1. Connect the machine, then set the main switch to ON to power electronics.
17 1. Start the control PC and launch the supplied marking software (we recommend AnyMarker Designer