jadomatis 1.2 1 This article summarizes the normal operating sequence for the Multi-Light workstation: switching on, running a marking job, and switching off. Only trained personnel may operate the system. Observe all safety notes before use.
2
3
jadomatis 1.3 4 = Before You Start =
5
6 * Ambient conditions within specifications; system acclimatized if there were temperature changes.
jadomatis 1.4 7 * Machine upright; transport locks removed; airflow at the 19" drawers unobstructed; filter mats clean.
8 * Laser protection window intact; protective housing and door interlocks OK.
9 * Fume/dust extraction ready.
10
11
12
jadomatis 1.5 13 = Switch On =
14
jadomatis 1.6 15 1. Verify mains voltage/frequency and cable conditions; mains switch is OFF.
jadomatis 1.8 16 1. Connect the machine, then set the main switch to ON to power electronics.
jadomatis 1.9 17 1. Start the control PC and launch the supplied marking software (we recommend AnyMarker Designer).
18 1. Confirm the controller is detected and ready (no active fault).
jadomatis 1.10 19 **Note**: If a fault is present, movements/functions are inhibited. Clear the cause before proceeding.
20
jadomatis 1.11 21
22
23 = Prepare The Job =
24
25 * Place the workpiece; close the door.
jadomatis 1.12 26 * Use the pilot laser to display the marking field/contours.
27 * Adjust Z-axis to focus on the surface; best focus is a prerequisite for durable, legible marks.
jadomatis 1.13 28 * Shift the workpiece until the correct marking position is reached.
29
30
31
32 = Run The Marking =