Last modified by jadomatis on 2025/10/06 07:17

From version 3.1
edited by jadomatis
on 2025/10/03 14:52
Change comment: There is no comment for this version
To version 1.19
edited by jadomatis
on 2025/09/30 09:23
Change comment: There is no comment for this version

Summary

Details

Page properties
Content
... ... @@ -1,4 +1,4 @@
1 -This article summarizes the normal operating sequence for the Multi-Light and Multi-Light PLUS workstations: switching on, running a marking job, and switching off. Only trained personnel may operate the system. Observe all safety notes before use.
1 +This article summarizes the normal operating sequence for the Multi-Light workstation: switching on, running a marking job, and switching off. Only trained personnel may operate the system. Observe all safety notes before use.
2 2  
3 3  
4 4  = Before You Start =
... ... @@ -38,7 +38,7 @@
38 38  
39 39  
40 40  
41 -= Quality Check And Adjust =
41 += Quality Check And Adjust =
42 42  
43 43  * Inspect legibility/contrast; if needed, adjust parameters or Z-focus and repeat a short test.
44 44  * Typical corrections: increase speed to shorten cycle time, increase power for weak marks, increase hatch spacing if fill is too dense; choose a plotter font if required.
... ... @@ -55,9 +55,4 @@
55 55  
56 56  = If Something Doesn't Work =
57 57  
58 -* Green LED off > system waits for acknowledgement > press blue acknowledge button.
59 -* Yellow LED off > door not fully closed > check door closure.
60 -* Red LED off with no marking > E-Stop or door open > reset E-Stop, check door.
61 -* Mark too weak > verify Z position/focus; increase power/speed; re-focus Z-axis.
62 -* Mark too slow > increase speed; increase power; reduce hatch density; use plotter font.
63 -**Note**: For faults that can't be rectified immediately: switch off and contact Schilling Service. Maintenance and repairs should only be performed by Schilling or authorized personnel.
58 +* Green LED off - system waits for acknowledgement -