1 1  This article summarizes the normal operating sequence for the Multi-Light workstation: switching on, running a marking job, and switching off. Only trained personnel may operate the system. Observe all safety notes before use.
2 2  
3 3  
4 -= Before You Start =
5 -
6 -* Ambient conditions within specifications; system acclimatized if there were temperature changes.
7 -* Machine upright; transport locks removed; airflow at the 19" drawers unobstructed; filter mats clean.
8 -* Laser protection window intact; protective housing and door interlocks OK.
9 -* Fume/dust extraction ready.
10 -
11 -
12 -
13 -= Switch On =
14 -
15 -1. Verify mains voltage/frequency and cable conditions; mains switch is OFF.
16 -1. Connect the machine, then set the main switch to ON to power electronics.
17 -1. Start the control PC and launch the supplied marking software (we recommend AnyMarker Designer).
18 -1. Confirm the controller is detected and ready (no active fault).
19 -If a fault is present, movements/functions are in
4 += Before =