Changes for page Operation (Start, Run, Shutdown)
Last modified by jadomatis on 2025/10/06 07:17
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -1,17 +1,4 @@ 1 1 This article summarizes the normal operating sequence for the Multi-Light workstation: switching on, running a marking job, and switching off. Only trained personnel may operate the system. Observe all safety notes before use. 2 2 3 3 4 -= Before You Start = 5 - 6 -* Ambient conditions within specifications; system acclimatized if there were temperature changes. 7 -* Machine upright; transport locks removed; airflow at the 19" drawers unobstructed; filter mats clean. 8 -* Laser protection window intact; protective housing and door interlocks OK. 9 -* Fume/dust extraction ready. 10 - 11 - 12 - 13 -= Switch On = 14 - 15 -1. Verify mains voltage/frequency and cable conditions; mains switch is OFF. 16 -1. Connect the machine, then set the main switch to ON to power electronics. 17 -1. Start the control PC and launch the supplied marking software (we recommend AnyMarker Designer 4 += Before =