Last modified by jadomatis on 2025/10/06 07:17

From version 1.6
edited by jadomatis
on 2025/09/30 07:48
Change comment: There is no comment for this version
To version 1.1
edited by jadomatis
on 2025/09/30 07:30
Change comment: There is no comment for this version

Summary

Details

Page properties
Content
... ... @@ -1,16 +1,1 @@
1 -This article summarizes the normal operating sequence for the Multi-Light workstation: switching on, running a marking job, and switching off. Only trained personnel may operate the system. Observe all safety notes before use.
2 -
3 -
4 -= Before You Start =
5 -
6 -* Ambient conditions within specifications; system acclimatized if there were temperature changes.
7 -* Machine upright; transport locks removed; airflow at the 19" drawers unobstructed; filter mats clean.
8 -* Laser protection window intact; protective housing and door interlocks OK.
9 -* Fume/dust extraction ready.
10 -
11 -
12 -
13 -= Switch On =
14 -
15 -1. Verify mains voltage/frequency and cable conditions; mains switch is OFF.
16 -1. Connec
1 +This article summarizes the normal