4 4  = Before You Start =
5 5  
6 6  * Ambient conditions within specifications; system acclimatized if there were temperature changes.
7 -* Machine upright; transport locks removed; a
7 +* Machine upright; transport locks removed; airflow at the 19" drawers unobstructed; filter mats clean.
8 +* Laser protection window intact; protective housing and door interlocks OK.
9 +* Fume/dust extraction ready.
10 +
11 +
12 +
13 += Switch On =
14 +
15 +1. Verify mains voltage/frequency and cable conditions; mains switch is OFF.
16 +1. Connect the machine, then set the main switch to ON to power electronics.
17 +1. Start the control PC and launch the supplied marking software (we recommend AnyMarker Designer).
18 +1. Confirm the controller is detected and ready (no active fault).
19 +**Note**: If a fault is present, movements/functions are inhibited. Clear the cause before proceeding.
20 +
21 +
22 +
23 += Prepare The Job =
24 +
25 +* Place the workpiece; close the door.
26 +* Use the pilot laser to display the marking field/contours.
27 +* Adjust Z-axis to focus on the surface; best focus is a prerequisite for durable, legible marks.
28 +* Shift the workpiece until the correct marking position is reached.
29 +
30 +
31 +
32 += Run The Marking =
33 +
34 +* Load the approved parameter set (power/speed/frequency/fill).
35 +* Ensure extraction is running; start the job with the door closed (interlocks engaged).
36 +* Monitor status LEDs and messages. Do not leave the machine unattended.
37 +* On completion the job ends and the system returns to the ready state.