Changes for page Operation (Start, Run, Shutdown)
Last modified by jadomatis on 2025/10/06 07:17
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -1,34 +1,4 @@ 1 1 This article summarizes the normal operating sequence for the Multi-Light workstation: switching on, running a marking job, and switching off. Only trained personnel may operate the system. Observe all safety notes before use. 2 2 3 3 4 -= Before You Start = 5 - 6 -* Ambient conditions within specifications; system acclimatized if there were temperature changes. 7 -* Machine upright; transport locks removed; airflow at the 19" drawers unobstructed; filter mats clean. 8 -* Laser protection window intact; protective housing and door interlocks OK. 9 -* Fume/dust extraction ready. 10 - 11 - 12 - 13 -= Switch On = 14 - 15 -1. Verify mains voltage/frequency and cable conditions; mains switch is OFF. 16 -1. Connect the machine, then set the main switch to ON to power electronics. 17 -1. Start the control PC and launch the supplied marking software (we recommend AnyMarker Designer). 18 -1. Confirm the controller is detected and ready (no active fault). 19 -**Note**: If a fault is present, movements/functions are inhibited. Clear the cause before proceeding. 20 - 21 - 22 - 23 -= Prepare The Job = 24 - 25 -* Place the workpiece; close the door. 26 -* Use the pilot laser to display the marking field/contours. 27 -* Adjust Z-axis to focus on the surface; best focus is a prerequisite for durable, legible marks. 28 -* Shift the workpiece until the correct marking position is reached. 29 - 30 - 31 - 32 -= Run The Marking = 33 - 34 - 4 += Before =