Last modified by jadomatis on 2025/10/06 07:17

From version 1.12
edited by jadomatis
on 2025/09/30 08:56
Change comment: There is no comment for this version
To version 1.3
edited by jadomatis
on 2025/09/30 07:32
Change comment: There is no comment for this version

Summary

Details

Page properties
Content
... ... @@ -4,25 +4,4 @@
4 4  = Before You Start =
5 5  
6 6  * Ambient conditions within specifications; system acclimatized if there were temperature changes.
7 -* Machine upright; transport locks removed; airflow at the 19" drawers unobstructed; filter mats clean.
8 -* Laser protection window intact; protective housing and door interlocks OK.
9 -* Fume/dust extraction ready.
10 -
11 -
12 -
13 -= Switch On =
14 -
15 -1. Verify mains voltage/frequency and cable conditions; mains switch is OFF.
16 -1. Connect the machine, then set the main switch to ON to power electronics.
17 -1. Start the control PC and launch the supplied marking software (we recommend AnyMarker Designer).
18 -1. Confirm the controller is detected and ready (no active fault).
19 -**Note**: If a fault is present, movements/functions are inhibited. Clear the cause before proceeding.
20 -
21 -
22 -
23 -= Prepare The Job =
24 -
25 -* Place the workpiece; close the door.
26 -* Use the pilot laser to display the marking field/contours.
27 -* Adjust Z-axis to focus on the surface; best focus is a prerequisite for durable, legible marks.
28 -* Shift the workpiece u
7 +* Machine upright; transport locks removed; a