... ... @@ -1,26 +1,1 @@
1 -This article summarizes the normal operating sequence for the Multi-Light workstation: switching on, running a marking job, and switching off. Only trained personnel may operate the system. Observe all safety notes before use.
2 -
3 -
4 -= Before You Start =
5 -
6 -* Ambient conditions within specifications; system acclimatized if there were temperature changes.
7 -* Machine upright; transport locks removed; airflow at the 19" drawers unobstructed; filter mats clean.
8 -* Laser protection window intact; protective housing and door interlocks OK.
9 -* Fume/dust extraction ready.
10 -
11 -
12 -
13 -= Switch On =
14 -
15 -1. Verify mains voltage/frequency and cable conditions; mains switch is OFF.
16 -1. Connect the machine, then set the main switch to ON to power electronics.
17 -1. Start the control PC and launch the supplied marking software (we recommend AnyMarker Designer).
18 -1. Confirm the controller is detected and ready (no active fault).
19 -**Note**: If a fault is present, movements/functions are inhibited. Clear the cause before proceeding.
20 -
21 -
22 -
23 -= Prepare The Job =
24 -
25 -* Place the workpiece; close the door.
26 -* Use the pilot laser
1 +This article summarizes the normal