Changes for page Operation (Start, Run, Shutdown)
Last modified by jadomatis on 2025/10/06 07:17
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -13,9 +13,4 @@ 13 13 = Switch On = 14 14 15 15 1. Verify mains voltage/frequency and cable conditions; mains switch is OFF. 16 -1. Connect the machine, then set the main switch to ON to power electronics. 17 -1. Start the control PC and launch the supplied marking software (we recommend AnyMarker Designer). 18 -1. Confirm the controller is detected and ready (no active fault). 19 -**Note**: If a fault is present, movements/functions are inhibited. Clear the cause before proceeding. 20 - 21 - 16 +1. Connec