| 1 | This article summarizes the normal operating sequence for the Multi-Light workstation: switching on, running a marking job, and switching off. Only trained personnel may operate the system. Observe all safety notes before use. | ||
| 2 | |||
| 3 | |||
| 4 | = Before You Start = | ||
| 5 | |||
| 6 | * Ambient conditions within specifications; system acclimatized if there were temperature changes. | ||
| 7 | * Machine upright; transport locks removed; airflow at the 19" drawers unobstructed; filter mats clean. | ||
| 8 | * Laser protection window intact; protective housing and door interlocks OK. | ||
| 9 | * Fume/dust extraction ready. | ||
| 10 | |||
| 11 | |||
| 12 | |||
| 13 | = Switch On = | ||
| 14 | |||
| 15 | 1. Verify mains voltage/frequency and cable conditions; mains switch is OFF. | ||
| 16 | 1. Connect the machine, then set the |