This article summarizes the normal operating sequence for the Multi-Light workstation: switching on, running a marking job, and switching off. Only trained personnel may operate the system. Observe all safety notes before use.
Before You Start
- Ambient conditions within specifications; system acclimatized if there were temperature changes.
- Machine upright; transport locks removed; airflow at the 19" drawers unobstructed; filter mats clean.
- Laser protection window intact; protective housing and door interlocks OK.
- Fume/dust extraction ready.
Switch On
- Verify mains voltage/frequency and cable conditions; mains switch is OFF.
- Connect the machine, then set the main switch to ON to power electronics.
- Start the control PC and launch the supplied marking software (we recommend AnyMarker Designer).
- Confirm the controller is detected and ready (no active fault).
Note: If a fault is present, movements/functions are inhibited. Clear the cause before proceeding.
Prepare The Job
- Place the workpiece; close the door.
- Use the pilot laser to display the marking field/contours.
- Adjust Z-axis to focus on the surface; best focus is a prerequisite for durable, legible marks.
- Shift the workpiece u