Wiki source code of Operation (Start, Run, Shutdown)
Show last authors
| author | version | line-number | content |
|---|---|---|---|
| 1 | This article summarizes the normal operating sequence for the Multi-Light workstation: switching on, running a marking job, and switching off. Only trained personnel may operate the system. Observe all safety notes before use. | ||
| 2 | |||
| 3 | |||
| 4 | = Before You Start = | ||
| 5 | |||
| 6 | * Ambient conditions within specifications; system acclimatized if there were temperature changes. | ||
| 7 | * Machine upright; transport locks removed; airflow at the 19" drawers unobstructed; filter mats clean. | ||
| 8 | * Laser protection window intact; protective housing and door interlocks OK. | ||
| 9 | * Fume/dust extraction ready. | ||
| 10 | |||
| 11 | |||
| 12 | |||
| 13 | = Switch On = | ||
| 14 | |||
| 15 | 1. Verify mains voltage/frequency and cable conditions; mains switch is OFF. | ||
| 16 | 1. Connect the machine, then set the main switch to ON to power electronics. | ||
| 17 | 1. Start the control PC and launch the supplied marking software (we recommend AnyMarker Designer). | ||
| 18 | 1. Confirm the controller is detected and ready (no active fault). | ||
| 19 | **Note**: If a fault is present, movements/functions are inhibited. Clear the cause before proceeding. | ||
| 20 | |||
| 21 | |||
| 22 | |||
| 23 | = Prepare The Job = | ||
| 24 | |||
| 25 | * Place the workpiece; close the door. | ||
| 26 | * Use the pilot laser to display the marking field/contours. | ||
| 27 | * Adjust Z-axis to focus on the surface; best focus is a prerequisite for durable, legible marks. | ||
| 28 | * Shift the workpiece u |