Preconditions (Before Switching On)
Confirm the following before applying power:
- Electrical installation is correct; mains voltage and frequency match the rating place. Main switch is OFF.
- Protective housing and door interlocks are intact; laser viewing window shows now damage.
- Optics are clean; remove any transport/lens cover only now. Avoid touching optics with bare hands.
- Ambient conditions: +15C to +35C. RH <90% non condensing; system acclimatized if temperature changed during transport.
- Airflow at 19" drawers is unobstructed; filter mats are clean to prevent heat build-up.
- Operator is familiar with laser safety requirements; responsibilities are defined.
Note: The Multi-Light contains a Class 4 source operated as Class 1 in the closed cabin. Never bypass safety devices.
Electrical Start-Up
- Connect the system to the specified mains supply. Ensure extraction is running.
- Set the mains switch to ON. Internal electronics initialize; status indicators light as described on the operator panel.
- Power on the control PC (or workstation) and peripherals needed for operation.
Software and Device Connection
- Launch the AnyMarker Designer software.
- Verify communication with the laser controller in the software (device connected, parameters readable).
If connection fails, switch OFF, check cabling and restart.
Initial Checks With Pilot Laser
- Load or create a test layout in AnyMarker Designer.
- Enable the pilot laser to project contours on the workpiece; verify orientation and placement without laser emission. Keep the door closed.
Z-Axis Focusing
- Place the workpiece/fixture in the work chamber and close the manual lift door.
- Use the automatic Z-axis to set focus to the surface (per lens focal distance). Follow the on-screen/readout guidance for focal height.
- Confirm best focus by pilot outline sharpness or focus gauge method recommended in the manual.
Parameter Verification
- Select a verified marking parameter set (power, speed, frequency, fill). Start with conservative energy to avoid burning or glare.
- Ensure extraction is active to remove gases, vapors, aerosols, and dust during test marking.
First Test Mark
- With the cabin closed and interlocks engaged, execute a short test mark on a sample of the target material.
- Observe quality and adjust parameters (e.g., reduce power/increase speed) as needed. Multiple repetitions may be used for depth, but monitor temperature to reduce fire risk.
- If unexpected behavior occurs, press STOP/EMERGENCY-STOP, investigate messages in Notifications, and correct the cause before resuming.
Post-Test Verification
- Inspect the mark; check legibility/contrast. Clean light residue if necessary.
- Re-check filters/airflow after prolonged tests. Excess dust must not accumulate.
- Document the approved parameter set for production.
Normal Operation Handover
- Train operators on door interl