Preconditions (Before Switching On)
Confirm the following before applying power:
- Electrical installation is correct; mains voltage and frequency match the rating place. Main switch is OFF.
- Protective housing and door interlocks are intact; laser viewing window shows now damage.
- Optics are clean; remove any transport/lens cover only now. Avoid touching optics with bare hands.
- Ambient conditions: +15C to +35C. RH <90% non condensing; system acclimatized if temperature changed during transport.
- Airflow at 19" drawers is unobstructed; filter mats are clean to prevent heat build-up.
- Operator is familiar with laser safety requirements; responsibilities are defined.
Note: The Multi-Light contains a Class 4 source operated as Class 1 in the closed cabin. Never bypass safety devices.
Electrical Start-Up
- Connect the system to the specified mains supply. Ensure extraction is running.
- Set the mains switch to ON. Internal electronics initialize; status indicators light as described on the operator panel.
- Power on the control PC (or workstation) and peripherals needed for operation.
Software and Device Connection
- Launch the AnyMarker Designer software.
- Verify communication with the laser controller in the software (device connected, parameters readable).
If connection fails, switch OFF, check cabling and restart.